After getting some footage we decided to try a few things out and edit a few clips to make a rough draft of the beginning.
We experimented on things like color correction, brightness, contrast, filters, slowing down clips and making clips faster. The outcome is not want we want because it is still really rough but we are happy with the mood the editing sets.
Monday, 24 November 2014
Friday, 7 November 2014
Organisation Of Locations
Here we have briefly described how we are going to film at the location we have chosen. We mentioned things like if the place is private or public. This work was completed by Phoebe.
Organisation Of Props
Here we made a small page showing how we have organised our props and how we will use them. This piece of work was completed by phoebe.
Tuesday, 4 November 2014
ARTIST PROFILE
Here we created a powerpoint where we went into a bit of detail about his character and his background. For example, how he got into music and how he became famous through it.
Sunday, 2 November 2014
MISE EN SCENE
Here we created a slideshow which states the mise en scene elements of each location we film at.
RECCE
Here we analysed the problems in filming at the locations we chose and also how we will overcome them.
RISK ASSESSMENT
Production Title: Pumped Up Kicks Assessor:
James Healy
Date: 29/10/2014 Location:
Tunnel
Risk
|
Who is at risk?
|
Level of Risk
|
Control measure to be implemented
|
While filming the actors could slip and hurt
themselves.
|
Actors
|
L
|
We should check the area to
make sure there isn’t any hazards.
|
When we are filming the camera could fall and
break. Especially if we are moving while using the camera.
|
No one
Equipment |
M
|
We would have to make sure
the camera is safely handled at all times.
|
The actors could bump into
members of the public when we are in action and filming.
|
Everyone/public
|
H
|
We will have to check to
see if there are any members of the public walking around when filming.
|
Production Title: Pumped Up Kicks Assessor:
James Healy
Date: 29/10/2014 Location:
Rooftop
Risk
|
Who is at risk?
|
Level of Risk
|
Control measure to be implemented
|
There is a risk of falling
off the side.
|
Everyone
|
L
|
Take extra care when near
the edges so that the risk of falling off is minimized.
|
It could rain on the day that we are filming and damage the camera and equipment.
|
Everyone
Equipment |
H
|
Film another day. We will need to check the weather reports daily to see if it is suitable to film.
|
The tripod could be placed
in a dangerous place.
|
Cameraman
|
M
|
To avoid the tripod falling and breaking we need to make sure it is
secure and safe before filming commences.
|
The camera could fall and
break while filming.
|
No one
Equipment |
M
|
Take care when handling the
camera and make sure it is secure on tripod.
|