Production Schedule
Date: 16th November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: We managed to get a lot of footage for
the beginning scenes. The actors looked good on the screen and the quality of
the picture was good.
It was hard to get footage of the artist performing as he
did not know the words well.
We gave the artist a copy of the lyrics so that hopefully
next time he is more comfortable singing into the camera/
Date: 20th-23rd November 2014
Action: Editing
Description: James started a small draft of the first few
scenes and was testing out different things we could do. He was experimenting
different colour corrections and different editing techniques such as
transitions.
Date: 23rd November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: FILMING WAS CANCELLED.
We had to cancel filming because there was really bad
weather and it did not stop raining. Because of this we moved this filming day
to the next Sunday.