PRODUCTION SCHEDULE

Production Schedule

Date: 16th November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: We managed to get a lot of footage for the beginning scenes. The actors looked good on the screen and the quality of the picture was good.
It was hard to get footage of the artist performing as he did not know the words well.
We gave the artist a copy of the lyrics so that hopefully next time he is more comfortable singing into the camera/

Date: 20th-23rd November 2014
Action: Editing
Description: James started a small draft of the first few scenes and was testing out different things we could do. He was experimenting different colour corrections and different editing techniques such as transitions.

Date: 23rd November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: FILMING WAS CANCELLED.
We had to cancel filming because there was really bad weather and it did not stop raining. Because of this we moved this filming day to the next Sunday.